Renovation Update: Couches, MORE Foam and Kitchen Cabinets

JW and I have been up at the house almost every day, accepting deliveries and moving in boxes.  We are so close to being done that the hubs has been spending some nights there to get the last of the projects done after work.

Here is what we had added in the past week or so:

Our couches and mattresses have been delivered, they dont look like much now but I was super excited to have them at least IN the house!

IMG_6436 IMG_6438

The hubby needed a quick temporary shower curtain in order to use the shower, notice the zip ties? stylish lol

IMG_6439

More foam! it never ends, here is the cut portion of the attic.

IMG_6437

Here are the kitchen cabinets in the boxes after delivery and half way installed, can you smell the yummy food that will soon be made in there? I sure can!

IMG_6440 IMG_6444

Later this week our appliances are being delivered and early next week the granite counter tops. So exciting!

Advertisements

Renovation Update: Finished Flooring, Bathroom and Basement

Here are some new pictures from the house!

The bathroom is functional, so we can say goodbye to the porter potty, yay!

photo 4 photo 2

The shower head and faucet have also been installed.

photo 3

The plumbing is complete in the basement and we even have a slop sink.

photo 3 photo 5

If our house had a brain this would be it.

photo 2

The floors are complete here is the master bedroom.

photo 1

The door to the sunroon has arrived and looks great!

photo 1

So much going in, so fast, getting excited now 🙂